I'm constructing my house, now at lintel level. I need belt concrete with laft..length - 22ft, berth- 11ft, one side laft for 2ft, *22ft length. Kindly inform me centring cost only, without material cost.
No Answer is Posted For this Question
Be the First to Post Answer
Which is the direction of negative angle?
what are the types of footing
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
how to find soil strength,and type of soil testing?
what is mean by reestimation?
0 Answers Ste Infrastructure Pvt Ltd,
how meny typs of renging rod?
how tl calculate lap lengh of concrete in different grade of concrete.
though u r a civil engineer, y r u interested in tcs???
0 Answers TCS, URC Construction,
Whr should a joint be located in a beam if the provision of a joint is unavoidable??
how is shear resisted in a structure?
for 1sft of Cement plastering ratio 1:3 How much quantity of cement and sand required.?
2 Answers CGL, URC Construction,
what"s the M book?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)