In reclamation works what are the importance of geotextiles and sand?

Answer Posted / Subham Chaudhary

Geotextiles play a crucial role in reclamation works by separating soil layers, preventing erosion, and improving drainage. They reinforce unstable slopes and allow for better compaction of fill materials. Sand is used as a filtering material during the installation of geotextiles to remove fine particles, ensuring proper water flow and maintaining the integrity of the geotextile. By using both geotextiles and sand in reclamation works, the overall stability and longevity of the project can be significantly improved.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

VAT and CST ? Which benefits for buyer ? Why benefits?

1900


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

2208


What is the per cu. mt. price of ready mix in Gujarat region.?

2427


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

5521


how can we calculate steel value, depending on load

2439


Technical Question of Civil Engineering

2354


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1663


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3233


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

2360


HOw much % of premium on DSR-2013 currently

2046


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

2554


material used for mendrel use to bend epoxy coated rebar

2243


Which is the latest version of solidsworks?

1340


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

2539


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2589