Explain what is the difference between built area and super built up area?
No Answer is Posted For this Question
Be the First to Post Answer
how to calculate the quantity of cement,sand and aggregate when the ratio of mixing is 1:2:3
0 Answers Ajnara Group, Assosa University,
How to preparation billing for high rise building? anyhow can give the tips
what is the minimum cement content for rcc as per is code
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
1) What is the compressive strength of concrete 2) What is the tensile strength of steel 3) Why cracks are happening in walls
wat is the quntities of cement and sand for 10msquer wii plastering for 10mm tick
List out the types of roofs?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
How many binding wire is use in arrangement of 25mt steel
If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
how to calculate cement mortor for wet and dry mix for different ratios
how much should we assume for the weight of foundation ??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)