For the construction project what capital cost has to be taken in consideration?
No Answer is Posted For this Question
Be the First to Post Answer
What is alternate bid?
very simple or less time consuming formula for reinforcement calculation by moment
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what is w/c ratio in dry lean concrete for m10 mix design
10 sqr in room reinforce concret so athu evvalavu wait thankum , atha eppati calculate panrathu
what is super elevation?
How to calculate no of 12 mm dia bars in a ton
Explain what is alternate bid?
what means if slump is less than 25mm and greater than 80mm?
M40 grade concrete has 40 n/mm2 strength.here what"s mean by n?
at what pressure ply-wood is obtained by gluing wooden sheets
Water cement mixing in hopper less mixture machine is better than hopper mixture machine because:
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)