how much of quantity of material required for execution of one cubic
meter of random rubble masonry in 1:3 cement mortar
No Answer is Posted For this Question
Be the First to Post Answer
what are the types of bridges respective to the span ?
Explain moment of inertia and its importance.
what"s the different between OPC (ordinary portland cement) and PPC (pozalana portland cement)?
3 Answers Ashok Leyland, Marathon Realty,
what is M20 ?
3 Answers L&T, Sukhwani Constructions,
what is the productivity in aluminium shuttering per day
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
Did any of the egyptian pyramids ever fall down?
yet i am not got any hallticket from aai junior excequtive exam.any one got application form from aai.
2 Answers AAI Airports Authority Of India,
Are you a team player?
What is the density of cement?
What is the density of DLC & PQC and how it is differ from normal concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)