10 sq m ,25mm thickness 1:2:4 cement and concrete floor how much cement required? 2 , if truck has a capcacity of 8 ton then how many bricks we can put on it ?
Answer / neeraj
The quantity of cement req.Is.0.055 cubic meter or approximately 1.58 bags of cement.... And the number of bricks loaded in truck is approximately 2857 bricks
| Is This Answer Correct ? | 4 Yes | 1 No |
Formula of mid span bar
0 Answers Modern Construction Company, PFPL,
How to compute minimum number of columns required for a site from area of site?
WHAT IS FLOOR AREA RATIO? Y IS IT NECESSARY? HOW TO CALCULATE IT?
plz tell me max persantage of sand for every mix design by volume or weight.
What is point of contraflexure ?
How to calculate paint drums per meter square
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
0 Answers Ace Info, Anil Group,
why there is no concrete mix of ratio 1:.5:1
what will be the quantity of following materials in P.C.C for the total area of (100'x70'x 0'4") 1)NO. OF CEMENT BAGS 2)SAND IN CU.FT 3)METTLE IN CU.FT
0 Answers Pratibha Industries,
How to activate isometric axes in cad?
1m square 20mm plastering how much of water need curing work
what is the tool used at construction site for measuring cement, sand and blue metal in india.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)