rimmer in pile foundation
No Answer is Posted For this Question
Be the First to Post Answer
why we used primmer in plumbing pipe??? and also what is SCH 80 AND SCH 40
1m3 3/4 inch course agreegate concrete is which m3 of agreegate ?
Where is lap in top & bottom beam
how to calculate stair case landing slab bottom shuttering marking,angle of stair case? top landing length-1250mm treads length-2700mm(9X300mm) rise length-1500mm(10X150mm top landing level +1.5m lvl bottom level-0.00m lvl
100sqft of 9" (brickwork).. bricks(standard)=no ? sand= cement=
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
what is mix design
why 50% more is assumed while calculating dry volume of coarse and fine aggregates in concrete calculations.whether 50% more is correct? How is it decided? whether the same is applicable to cement volume. Also what about cement mortar dr volume? How much more is to be considered for dry volume of mortar.
Define Chimney in Thermal power plant?
use ofr concrete as per grade ?
1.0 what is the permissible westage of steel in structural steel fabrication say gantry , trustle of power plant unit 2.0 what is the permissible westage of cement in construction work as above
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)