what is the initial setting time & maximum duration concrete
get hardening for ordinary portland cement?
Answers were Sorted based on User's Feedback
Answer / karthik rajendren
The initial seting time for OPC is 30 mins and max time 10
hrs to become hard.
| Is This Answer Correct ? | 24 Yes | 3 No |
Answer / sabari
The initial setting time of the cement should not be less
then 30mins,final setting time of the cement should not be
more than 10hrs
| Is This Answer Correct ? | 10 Yes | 2 No |
Answer / ajaybir
initial setting time = 30 min
Maximum setting time = 600 minutes
| Is This Answer Correct ? | 7 Yes | 0 No |
what is difference between fluidity and workability also how palsticizer works
What is creep ,deflection and shrinkage in concrete
1 bundle=how many rods s there? and what is the length of each rod
what is work of planning deptt. in any construction compny (in road project)
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
Define a polyline?
how much % of fine sand(jamuna sand)we can use with coase sand for making concrete.
WHAT IS TEAM SIZE IN CONSTRUCTION WORK
How to distinguish that the soil is clay, silt, sand & murrum at site. (just by looking at it with out doing the sieve analysis test??
what is the formula to calculate isolated footing
What is the Maximum %age of Steel in columns and beams ?
is excessive curing for brick work is good or bad for the walls?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)