what is the initial setting time & maximum duration concrete
get hardening for ordinary portland cement?

Answers were Sorted based on User's Feedback



what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / karthik rajendren

The initial seting time for OPC is 30 mins and max time 10
hrs to become hard.

Is This Answer Correct ?    24 Yes 3 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / sabari

The initial setting time of the cement should not be less
then 30mins,final setting time of the cement should not be
more than 10hrs

Is This Answer Correct ?    10 Yes 2 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / ajaybir

initial setting time = 30 min
Maximum setting time = 600 minutes

Is This Answer Correct ?    7 Yes 0 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / deepak katyal

IST- 30 Minutes
FST- 600 Minutes

Is This Answer Correct ?    2 Yes 0 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / shaikh shahrukh

30 mins

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how find the cut length of tringular ring and any formula find out the quantity of circular brick work

1 Answers   Lira Construction, Om Metals,


Why we use pcc in foundation?

1 Answers  


I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'

0 Answers   Ajai Builders, Malhotra Associates,


The mixture of different ingredients of cement is burnt at?

0 Answers  


what is anchor bar??

3 Answers   Construction, SPIC,






Whether dry volume or wet volume of concrete more but why?

1 Answers   Hiranandani,


Target strength = fck +(1.65*4) What is this 4

4 Answers   Gammon,


What does civil engineering mean?

0 Answers  


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

0 Answers  


what is mean by bulking of sand?

1 Answers   CCCL, Mytas,


what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.

0 Answers   bscpl,


How we calculate the service time of buildings

0 Answers   SPML,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)