Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the initial setting time & maximum duration concrete
get hardening for ordinary portland cement?

Answers were Sorted based on User's Feedback



what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / karthik rajendren

The initial seting time for OPC is 30 mins and max time 10
hrs to become hard.

Is This Answer Correct ?    24 Yes 3 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / sabari

The initial setting time of the cement should not be less
then 30mins,final setting time of the cement should not be
more than 10hrs

Is This Answer Correct ?    10 Yes 2 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / ajaybir

initial setting time = 30 min
Maximum setting time = 600 minutes

Is This Answer Correct ?    7 Yes 0 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / deepak katyal

IST- 30 Minutes
FST- 600 Minutes

Is This Answer Correct ?    2 Yes 0 No

what is the initial setting time & maximum duration concrete get hardening for ordinary portlan..

Answer / shaikh shahrukh

30 mins

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

In reclamation works what are the importance of geotextiles and sand?

0 Answers  


i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???

0 Answers   QRI,


what is the minimum cement content for rcc as per is code

4 Answers   JMC Projects,


As a site engineer what do you check in foundation before concreting

3 Answers  


Which are the top apps for you civil engineer?

0 Answers  


Define What is the best type of wood glue?

0 Answers  


to draw bm diagrams for portal frames under different loadings//

0 Answers   L&T,


what is compressive strength of bricks?

11 Answers   L&T,


Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....

0 Answers  


I am called for interview from north east power plant .so, I need some interview question which may help me.

0 Answers   Power Plant,


significance of specific surface area of particles?

2 Answers  


A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)