If drainage is main things then which respect the super
Elevation may be provided?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
Super elevation are provided mainly in a curve surface.
Drainage is the not main cause.In super elevation the outer
edge of the road is raised in respect to inner
edge.Drainage are provided for water flow. so road are
slope in respect to drain so that water can easily flow.
No super elevation are provided for drainage.
Is This Answer Correct ? | 7 Yes | 1 No |
Answer / ifelola
Super elevation curves are provided to counter the effect
of centrifugal forces at curves to avoid skiding
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / j ritesh naidu
superelevation is provided at curves to compensate the forces generated on moving object while it is turning ....otherwise the moving object has to slow down its speed in worst case the moving object may skid or even topple...super elevation on curves helps the moving object turn along the curve without reducing speed
drainage has no connection with superelevation ...for drainage part ,cross drainages along the road r provided
Is This Answer Correct ? | 0 Yes | 0 No |
How much percentage of silt contain maximum allowed?
How to calculate cement and sand quantities in cement mortar As 1:1,1:2,1:4,1:6 ?
15 Answers Boss Global, JP Group, Kerakoll, NextGen, Simplex,
What is Lap Length??????
it is a corrected question." make a list of engineering property(properties) of soil.
0 Answers AAI Airports Authority Of India, DLF,
what is the m20 grade concrete ingredients?
What are the benefits of rcc pipes over steel designed pipes?
At which place Construction joint should provide in slab and Beam at the time of casting.
How many % we consider for lap for reinforcement for estimates
For 100 bag cement how i will calculate sand and metal aggregate.Mixing proportion 1:1.49:2.38
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
How much quantity of steel will be used for commercial building consists of ground floor shops, first floor shops, second floor will be for offices and third floor will be office/banks. How many tons of steel is required to construct this building.
what is mean by splice length? As there were any formula to calculate the splice lenght?