I have an span length 16 ft c/c
No Answer is Posted For this Question
Be the First to Post Answer
Prepare a Schedule for a Highrised building from starting stage to Handover?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
Define What happens to Load at yielding ?
How to calculate the Quantity of Steel for Footing?
WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC
7 Answers Omaxe, Shoba Devlopers,
What is thumb rule for deep trench excavation
wat is the necessity of finding shear and bending moment in a structure. wat will happen if it is not consider. other than shear cracks and deflection is there any other failure happen.
Which code is used for tor & tmt steel bar?
how much of the strength comes from post-production curing
WHAT IS THE MINIMUM WATER CONTENT PER ONE BAG CEMENT FOR M20 CONCRETE
Minimum and maximum size of the building components
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?