how can calculate material in 1:1.5:3 ratio in concrete
Answer / madhusudhan
for 1 m³ concrete (M20=1:1.5:3)the material required is
(1+1.5+3)=5.5
1/5.5=0.1818*1440=261kg cement or 5.32 bags
1.5/5.5=0.272 m³ Fine aggregate
3/5.5=0.545 m³ Coarse Aggregate
| Is This Answer Correct ? | 0 Yes | 0 No |
Our IDCT industrial cooling tower height is 15 mtres so need to RCC structure stability test as par any IS Standard or Indian act.
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
0 Answers Ajai Builders, Malhotra Associates,
what is meant by concrete joints?
What are the reasons for geotechnical site investigations in uganda?
How many materials e.g bricks, cement, sand, stone required to build a house for 100 sqft
whats the field test of cement,aggregate and water
What is m & 20.& what is fe&415.
deshuttering time for RCC wall & column
yasser arfatcompleted his degree in civil from which university
what is mean by super structure?
which steel is better for residential building tmt steel or hysd steel
what ratio of cement and sand we used for making cover
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)