for 1 m³ concrete (M20=1:1.5:3)the material required is
(1+1.5+3)=5.5
1/5.5=0.1818*1440=261kg cement or 5.32 bags
1.5/5.5=0.272 m³ Fine aggregate
3/5.5=0.545 m³ Coarse Aggregate
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
Questions related to civil.engg in company
what is the use of beam end forces while using a staad ? wha they are show
Doul Bar reinforcement and details of drawing.
how to calculate the scour depth
Why Vitrified tile are getting pop up.
Define What is the meaning of a blue land surveyors flag?
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
What is braced excavation all about?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
What is the use of mirror command?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
how we calculate the vol.of wet concrete..?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
Define aligned dimension?