what is means of M50,M20,M15 like this please tell me ?
No Answer is Posted For this Question
Be the First to Post Answer
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What is the rate of earthwork excavation?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
3,6,13,26,33,66,____
Why bent up bars provided in R.C.C slab
16 Answers GATE, L&T, Omax,
calculate 1-2-4 ration concrete - cement - sand metal and water required for 1 cum
what do you mean by punching shear?
where i can get material costs on weekly basis
what r you reqired for concrete baching plant?
is there any simple field method to ascertained the bearing capacity of soil (with least arrangement/ Wedge penetration etc...).
what is water cement ratio and how to calculate it after designing the concrete?
what is penetration test?why it is done?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)