Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


WBM Road aggregates quantity calculation



WBM Road aggregates quantity calculation..

Answer / b. adinarayana

it is calculated as usally as product of LBH but express in two QTY 1 is in loose state
2 in compacte state

Is This Answer Correct ?    5 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

what is the relation between pitch of steel and depth of slab?

0 Answers   RBI,


How do you calculate reinforcement weight of steel?

0 Answers  


what is the maximum number of course that can be laid according to IS code and the max height.

0 Answers  


What is meant by M20 grade of concrete???

5 Answers   Simplex,


ratio of sand, cement and metal in all concrete mix

2 Answers  


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

0 Answers   First American Corporation, GS Infra, L&T, Real Sociedad,


what is injection grouting and what is rewiring.

1 Answers  


What are the advantages and disadvantages of Solid blocks over clay bricks in civil constructions ?

1 Answers  


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

0 Answers   CCCL,


How du we calculate dry cement (in Bags) for any concrete, also sand and aggregate? How many bags of cement does 100 cft of concrete 1:2:4 require? Procedure to calculate the required amount. Also if there is any easy thumb rule to find out.

3 Answers  


How do we say The LAP LENGHT is 50D to 60D ?????

3 Answers  


how much steel and concrete required for 450 sft slab? tell also the method

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)