What material should be used for casting the beam-column junction if beams and columns are of different grades?? For example concrete in beams and Columns is M20 and M25 respectively.
if water absorption is more than 25 percent in brick, what is the defect in it?
What is the meaning of TMT on Steel rebars
define the authorized overlap in columns
What are the applications of the modulus of elasticity?
Define a polyline?
How much steel required in 1 square feet slab?
what is M & 20 of M20 concrete
11 Answers Bharti, Sheladia Associates, URC Construction,
How to find permissible diagonal tensile stress in reinforced brick work
For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
what is the stripping time of beam column & slab?
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)