how to calculate the steel for rcc slab 1100 Square feet
Answer / sekhar ruttala
for 150mm thick concrete take 2% of concrete
| Is This Answer Correct ? | 1 Yes | 1 No |
what is density of flyash?
how much quantity of bending wire required for 1sqmts
DESIGN PROCEDURE OF THE COLUMNS
how to take concrete quantity for precast segment for viaduct project?
which member is very strong (strength) after the cross- section area is same, pipe section or solid rod section ? no that's not my question, my question is why pipe section is strong ?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
what is the no. of IS Code?
1 cum of 60*25*25 block cost 187 dirhams. Find the cost of 1 sqm of block ?
why we are useing plastic under the lean concrete?and whts the advantage?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)