factory shed foundation
l=4,
b=3'
d=8' rcc foudation for top to bottom
pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
No Answer is Posted For this Question
Be the First to Post Answer
what is the difference b/w full length and cutting length?
what is stress
what is the types of surveying?which type of survey carrying for type of work?
pls give me some basic informations in construction of a structure?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
Define What is an ice dam sock?
How much kilogram of binding wire required for fabricate one Metric ton of reinforcing steel
How do you determine or evaluate success?
How did street originate in the plumbing term street ell?
HOW MUCH WATER DO YOU NEED TO MIX IN TO COMPACT100M3 OF ROAD QUALITY BORROWPIT GRAVEL
what if tie beams coming from x axis do not meet tie beam coming from y axis? Is it safe if they dont meet?
What is specific gravity???
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)