Hello every one
I am currently working in IT side but i have an offer to work under 'A' license holder and he says i can get c license what is the use of c license and what shall i do after getting it basically i am an electrical graduate please help me shall i leave this it job and work in electrical maintenance will i have a good future i am confused
Thank You in Advance



Hello every one I am currently working in IT side but i have an offer to work under 'A..

Answer / rajasekar.p

hi, good future is in your hand not in the type job, if you were wel endowed with your skills, you can survive in any field.

you will get c license with your 2 year experience certificate in erection field or in 11kv sub station o&m maintenance only. c license gives you job security but you should renew it. with this c license you can go to any company and finilize your job. If you choose maintenance field. growth will be slower but steady growth is assured, less work pressure, frequent update is necessary about equipments, and sfps(safety fix protection system). Core job nature is, surviving in single company is very hard once you survived in it. company wont send you out at any cost.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

How to calculate Number of Earthing Pits....???

0 Answers  


How many electrones need to flow in one second to equivalent to one Ampere.

3 Answers  


what is the mho relay

3 Answers  


why current flows from +ve to -ve terminal

7 Answers  


What do you mean by Transformer?

9 Answers   Hyundai, NTPC, wbsedcl,






An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

0 Answers   UOG,


how to convert psi into kilo pascal? what is the suction pressure & discharge pressure of chiller?

1 Answers  


what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?

0 Answers   Siemens,


Hi, My question is our total motor load is 55 kw.so what cable size required for main supply. Please reply

1 Answers   Maryam Enterprises,


What is meant by earthhing of a magnetic flow meter and when to use empty pipe detection?

0 Answers  


what is plunger and what's the use of it in motor alignment?

0 Answers   CLZ, Yahoo,


Calculation for the adequacy of 380 KVA neutral earth flat size

1 Answers   Electrical,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)