Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why we use ac as a electric appliance
in home or daily use?



why we use ac as a electric appliance in home or daily use?..

Answer / amit rajak

Alternating Current is considerably easy in handling as
compared to Direct Current which actually needs some
additional devices for its regulation and control

and also
dangerous if a person comes in direct contact of dc.


and also
Alternating current has also efficiency more tnan Direct
Current

Is This Answer Correct ?    11 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

how much insulation resistance 11kv & 33kv under ground cable between earth to phase & phase to phase.

4 Answers   Siemens,


I NEED THE CABLE SIZE. I=800A AND P=315KW

2 Answers   ABC, Wipro,


why grid failure happens?

1 Answers  


If the secondary winding will be open in current transformer, how to damage the insulators

2 Answers   TPDDL,


Why earthing is required for diesel tank?

4 Answers   Greaves,


why indicated sypply only by 440V in 3-phase system.

2 Answers  


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

0 Answers  


Thumb rule of cable size(rm>30 rm)X multiplying factor=ampere

0 Answers   Kazi Farms, SKI Carbon Black,


if we have 320KVA Genset kindly advice how much load we can put it.

0 Answers  


what is the earth to neutral voltage(maximum and minimum) according to ieee standards

4 Answers  


Define coil span?

0 Answers  


what is voltage gradient?

8 Answers   Bhel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)