how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
No Answer is Posted For this Question
Be the First to Post Answer
how to calculate concrete qty for footing using M25 grade 1:1:2 for 731 cft.
9 Answers Abuilding Lab, L&T, MPSC, Vellapally,
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
In olden days reinforcing bars in concrete are not got rusted even till now. But recently provided steel getting rusted in concrete. what are the probable reasons?
10mm Rebar total 12meters length how to calculate ?
How to check percentage of bulkage of sand in RCC?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
Define What is the distance between railway tracks?
What is the construction cost per sq foot for residential building and give bifurcation of same?
what is mean by stripping?
what"s the difference between fe 415 grade steel and fe 500 grade steel? and which one is mostly used for residential and apartment constructions?
why we always consider Bulkage due to the voids only for the Fine aggregates not for the Coarse aggregates
where vr providing singly reinforced beam. i want to know the location of it in a building