rate analysis hiring of generator 62.5 KVA
No Answer is Posted For this Question
Be the First to Post Answer
What is the purpose of Chipping in the heavy foundation?
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
19 Answers DNA Infrastructure, HCC, L&T,
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
what are different grades of concrete and their classifications?
in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
What is the density of DLC & PQC and how it is differ from normal concrete?
What is the compressive strength of noramal clay bricks and AAC bricks??. which one is better for load bearing wall//
2 Answers College School Exams Tests,
neutral axis more than the critical neutral axis then rainforcement in rcc beam belong to over or under rainforcement
how to calculate quantity of steel in a slab , coloumn and beam
1 Answers JSW, Om Sai Builders,
I found a crack on a slab in my resi.bldg.There must be a leakage.what shall i do for preventing the leakage?
What are the advantages of Prestressed Concrete
what we do if excavation is more than actual requirement
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)