how we calculate electricity unit ( meter unit.. for knowing how many charges) from on motor load.?
Answers were Sorted based on User's Feedback
Answer / suryanaik02@gmail.com
the power consumed can be read from the nameplate of the appliance and this multiplied by the time gives KWH if time were in hours. This divided by 1000 gives the units consumed and multiply this units by per unit charge. Note that per unit charge may be slabs, so that if your usage exceeds certain value, you may have to pay double oor tripple or more charges.
But the basic problem in finding the time of operation of AC is that, it is not easy to predict how much time it wil operate?. It depends on two things. one is the heat load. if you are frequently opening the doors of the air conditioned room, the heat load will be more and the AC will operate more time. Second the hysteresis of the AC. This may either be manufacturer set or user configurable. If it is user configurable, try a wide hysteresis to lower the time of operation of AC and its frequent start/stops. But this sacrifies your comfort.
| Is This Answer Correct ? | 0 Yes | 0 No |
can you plz send l&t aptitude questions if available its urgent plz plz plz
Main Differance between Primary Distribution & Secondary Distribution Of Electricity....?
I want to make street light with solar system ... What may I do for procedure and how much of estimation for each material ... If any one knows guide me and inform this id : aravindd7@gmail.com
what is the difference between OD and VL
Is itnecessary to use capacitor in an Fluorescent Tube Light Fixtures? Why? What if not capacitors are not included?
What are the advantages of thermal power plant?
If there is volagte between earth and neutral, what should be the reason ? and solution * What should be allowable limit in case, if the voltage between earth and neutral exist ? / OR what is limit for safe voltage between earth and neutral?
What is the importance of creepage distance in disc insulator ?
Explain why the Voltage drop will happen in 3 Phase line?
We have a bank capacitor rating of 60 KVAR for a overall load of 160 KVA and we have connected three loads of 50KVA each. We would like to auto matically correct PF using APFC. How do we design it?
working function importance of mdc meter
66kv under ground cable how to layaing in ground any special case two ckt r runing
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)