How much material is required for constructing a 2 Lane 2Km rigid pavement road
No Answer is Posted For this Question
Be the First to Post Answer
difference b/w stress and strength
which has high coefficient of discharge venturimeter or orificemeter
why wire mesh is used in plastering
Brick work how many days curing and at any concreting pl
Deduction in length of reinforcement steel for bar bending
How to calculate carrying capacity of the existing water supply trunkmain
how much % of fine sand(jamuna sand)we can use with coase sand for making concrete.
Why we provide chair for slab reinforcement? How to place chair distributors to distributors or top distributors to bottom main?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
1cubic meter of bricks = ? kg
how do we calculate wastage of steel in the site,what r the items to taken into account for wastage calculation?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.