Questions Answers Category Views Company eMail

How much material is required for constructing a 2 Lane 2Km rigid pavement road

HCC,

Civil Engineering 1725

Which is economical... A column of size 9"*9" Using M20 Or a column of Size 9"*12" Using M15

L&T,

3 Civil Engineering 4037




Answers / { mashx }

Question { UltraTech, 17455 }

one litre of shuttering oil how much area covered the
shuttering?


Answer

1 litre shuttering oil =90sqft (Approx)
90sqft= 8.36sqm
therefore 1 lt Shuttring oil = 8.36sqm

Is This Answer Correct ?    0 Yes 1 No

Question { UltraTech, 17455 }

one litre of shuttering oil how much area covered the
shuttering?


Answer

Check this site for complete shuttering material req.

http://civilatwork.blogspot.in/2013/07/calculations-of-shuttering-material.html

Is This Answer Correct ?    0 Yes 0 No


Question { Student, 2900 }

I've 47'-6" x 89'-6" of flat RCC Slab 12mm dia 8" c/c. Please calculate the total weight of slab, weight of steel, and how much dead load it contains. Thanks


Answer

Total area = 47.5*89.5=4251.25 sqft
Convrt it into sqm (1sqft=.0929sqm)
425* .0929=394.5sqm
Let's take 395sqm
Assume depth of slab be 100mm
395*(100/1000) = 39.5cum
DL of slab =2500*39.5=98750kg

Is This Answer Correct ?    3 Yes 0 No

Question { 3656 }

What is the full form of NASA


Answer

National aeronautics and Space Administration