1 cum brick work CM1:6 how many bricks sand cement required
brick size 8"4"3"
Answers were Sorted based on User's Feedback
Answer / md. mainul islam
Bricks:667 nos
Sand:16.54 cft
Cement:2.20 Bag
| Is This Answer Correct ? | 0 Yes | 5 No |
how many grades in concrete? list out
Floor tile measurement? Wall to wall or skirting to skirting
how to cal 1:4 in brick masonary work cement and sand?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
how preparing for barbending schedule ? how to preparig for two leged stirrups?
koi bta sakta ha ka steel ko calculate krna ka full mathod pls
Explain Different types of raft foundation
What are the tests conducted on coarse aggregates ?
Defination of civil engineering
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
what is the weight of a cubic meter of M10 concrete?
what is the ingrediants of wet mix macadam?construction procedure?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)