Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


1 cum brick work CM1:6 how many bricks sand cement required
brick size 8"4"3"

Answers were Sorted based on User's Feedback



1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"..

Answer / mkumar

bricks: 485

Is This Answer Correct ?    1 Yes 0 No

1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"..

Answer / ashok

Sand 2.25 cm
cement 1.23 bag
Bricks 667 nod. ..

Is This Answer Correct ?    0 Yes 1 No

1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"..

Answer / md. mainul islam

Bricks:667 nos
Sand:16.54 cft
Cement:2.20 Bag

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

how many grades in concrete? list out

6 Answers   McNally,


Floor tile measurement? Wall to wall or skirting to skirting

0 Answers  


how to cal 1:4 in brick masonary work cement and sand?

1 Answers  


LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.

0 Answers  


how preparing for barbending schedule ? how to preparig for two leged stirrups?

2 Answers   L&T,


koi bta sakta ha ka steel ko calculate krna ka full mathod pls

4 Answers  


Explain Different types of raft foundation

1 Answers  


What are the tests conducted on coarse aggregates ?

3 Answers   Rites,


Defination of civil engineering

6 Answers  


i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???

0 Answers   QRI,


what is the weight of a cubic meter of M10 concrete?

5 Answers   L&T,


what is the ingrediants of wet mix macadam?construction procedure?

6 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)