Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to find quantity of total concrete, cement bags and sand. for any ratio

Answers were Sorted based on User's Feedback



how to find quantity of total concrete, cement bags and sand. for any ratio..

Answer / vikas p

Consider M20 (1:1.5:3) Grade Concrete

A) Suppose Total Volume of concrete= 1 Cum.
B) Add 55% volume for dry mortar=0.55 Cum.
C) Total wet volume of concrete A+B = 1.55 Cum.
D) Cement = 1.55/ (1+1.5+3) = 0.18 Cum. = (0.18/0.035=5.14 Bags)
E) Therefore Fine aggregate = 0.18 cum X 1.5 = 0.27 Cum.
F) Therefore Coarse aggregate = 0.18 cum X 3 = 0.54 Cum.

Is This Answer Correct ?    4 Yes 1 No

how to find quantity of total concrete, cement bags and sand. for any ratio..

Answer / amit

For cement=0.158* required volume in cum/ratio factor (eg m20=1+1.5+3)
= answer/.035 which gives you no of bag
For sand=1st cement ratio answer* 1.5 which gives you cum of sand
Same for aggregate

Is This Answer Correct ?    1 Yes 0 No

how to find quantity of total concrete, cement bags and sand. for any ratio..

Answer / nilesh kulkarni

If built up area of the building is known to you ,
You can calculate the qty as per constants for any ratio

Concrete Qty:- 0.03 Cum/Sqft

Cement For :- RCC Work = 0.19 Bag/Sqft
Masonary Work = 0.08 Bag/Sqft
Plastering Work = 0.15 Bag/Sqft
Other Work = 0.03 Bag/Sqft
---Total Cement--------- 0.45 Bag/Sqft----------------------------
-------------------------------------------
Sand For :- RCC Work = 0.75 Cft/Sqft
Masonary Work = 0.36 Cft/Sqft
Int. Plastering Work = 1.00 Cft/Sqft
Ext. Plastering Work = 0.65 Cft/Sqft
Tiling Work = 0.13 Cft/Sqft
W/p Work = 0.08 Cft/Sqft
Other Work = 0.02 Cft/Sqft
Total Sand---------------- 3.00 Cft/Sqft----------------------------
-------------------------------------------

Is This Answer Correct ?    1 Yes 0 No

how to find quantity of total concrete, cement bags and sand. for any ratio..

Answer / nadim shaikh

for any quantity firstly you will need drawing of RCC members and architectural drawing
secondary you should know nominal mix ratio

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

what is the formular for measuring minimum depth of a foundation

3 Answers  


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

0 Answers   College School Exams Tests,


How many nos. are Contains fly ash Brick in one Cubic meter ?

3 Answers  


List out the diameter of series of bar for beam, column, slab and footing?

5 Answers  


The 4 main factors to start a construction project are––

0 Answers  


Why we check specific gravity of admixture when we receive it? What is it's significance.

1 Answers  


how to calculate no of rings & weight of column including rings?

2 Answers   HCC, Shivam Constructions,


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

0 Answers  


How do you measure concrete?

1 Answers  


what is the diffrence between Specific gravity & Density??

3 Answers  


what is the weight of 10mm,20mm,40mm aggregate

0 Answers   L&T, Ramky,


how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)