how to find quantity of total concrete, cement bags and sand. for any ratio
Answers were Sorted based on User's Feedback
Answer / vikas p
Consider M20 (1:1.5:3) Grade Concrete
A) Suppose Total Volume of concrete= 1 Cum.
B) Add 55% volume for dry mortar=0.55 Cum.
C) Total wet volume of concrete A+B = 1.55 Cum.
D) Cement = 1.55/ (1+1.5+3) = 0.18 Cum. = (0.18/0.035=5.14 Bags)
E) Therefore Fine aggregate = 0.18 cum X 1.5 = 0.27 Cum.
F) Therefore Coarse aggregate = 0.18 cum X 3 = 0.54 Cum.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / amit
For cement=0.158* required volume in cum/ratio factor (eg m20=1+1.5+3)
= answer/.035 which gives you no of bag
For sand=1st cement ratio answer* 1.5 which gives you cum of sand
Same for aggregate
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / nilesh kulkarni
If built up area of the building is known to you ,
You can calculate the qty as per constants for any ratio
Concrete Qty:- 0.03 Cum/Sqft
Cement For :- RCC Work = 0.19 Bag/Sqft
Masonary Work = 0.08 Bag/Sqft
Plastering Work = 0.15 Bag/Sqft
Other Work = 0.03 Bag/Sqft
---Total Cement--------- 0.45 Bag/Sqft----------------------------
-------------------------------------------
Sand For :- RCC Work = 0.75 Cft/Sqft
Masonary Work = 0.36 Cft/Sqft
Int. Plastering Work = 1.00 Cft/Sqft
Ext. Plastering Work = 0.65 Cft/Sqft
Tiling Work = 0.13 Cft/Sqft
W/p Work = 0.08 Cft/Sqft
Other Work = 0.02 Cft/Sqft
Total Sand---------------- 3.00 Cft/Sqft----------------------------
-------------------------------------------
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / nadim shaikh
for any quantity firstly you will need drawing of RCC members and architectural drawing
secondary you should know nominal mix ratio
| Is This Answer Correct ? | 0 Yes | 1 No |
what is the formular for measuring minimum depth of a foundation
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
0 Answers College School Exams Tests,
How many nos. are Contains fly ash Brick in one Cubic meter ?
List out the diameter of series of bar for beam, column, slab and footing?
The 4 main factors to start a construction project are––
Why we check specific gravity of admixture when we receive it? What is it's significance.
how to calculate no of rings & weight of column including rings?
2 Answers HCC, Shivam Constructions,
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
How do you measure concrete?
what is the diffrence between Specific gravity & Density??
what is the weight of 10mm,20mm,40mm aggregate
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)