Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to find quantity of total concrete, cement bags and sand. for any ratio

Answer Posted / nilesh kulkarni

If built up area of the building is known to you ,
You can calculate the qty as per constants for any ratio

Concrete Qty:- 0.03 Cum/Sqft

Cement For :- RCC Work = 0.19 Bag/Sqft
Masonary Work = 0.08 Bag/Sqft
Plastering Work = 0.15 Bag/Sqft
Other Work = 0.03 Bag/Sqft
---Total Cement--------- 0.45 Bag/Sqft----------------------------
-------------------------------------------
Sand For :- RCC Work = 0.75 Cft/Sqft
Masonary Work = 0.36 Cft/Sqft
Int. Plastering Work = 1.00 Cft/Sqft
Ext. Plastering Work = 0.65 Cft/Sqft
Tiling Work = 0.13 Cft/Sqft
W/p Work = 0.08 Cft/Sqft
Other Work = 0.02 Cft/Sqft
Total Sand---------------- 3.00 Cft/Sqft----------------------------
-------------------------------------------

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

procedure for preliminary selection of size of column of 5 storey building

3295


Who designed the city of washington dc?

1334


IS code for Rolling Margin of steel

2550


What is the software used in civil engineering?

1150


What is braced excavation all about?

1202


What does civil status mean?

1249


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2520


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

2355


what is difference between fluidity and workability also how palsticizer works

7529


how to tie 10 legged stirrups

6595


what are the values of compressieve strenght?

2106


i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

1958


what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/

2327


Define What is made from large rocks, which protects the base of cliffs?

1130


how much cement sand n bricks required in im3?and how much in plaster?

2602