explain how to calculate top and bottom diagonals for transimission line tower foundation with prop setting
No Answer is Posted For this Question
Be the First to Post Answer
What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.
1 Answers AKM Construction Management,
Geometric Design Related Code name in India.
how many material required for brickbat water proofing of toilets.
how can change 10mm dia @130c/c bar spacing to 8mm dia
Grades of concrete
28 Answers Mittal Steel, UNOPS,
what is the steel difference between np-2 and np-3 pipes and weight also
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
what is chicken mesh?explain its use
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
clean earthing and dirty earthing
1 Answers CSCEC-China State Construction Engineering Corporation,
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)