how to find quantity of total concrete, cement bags and sand. for any ratio
Answer Posted / amit
For cement=0.158* required volume in cum/ratio factor (eg m20=1+1.5+3)
= answer/.035 which gives you no of bag
For sand=1st cement ratio answer* 1.5 which gives you cum of sand
Same for aggregate
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
if the nitrates more than 45mg/l in water lead to disease then what is it called
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
why demand factor less then 1 ?
what is the clear cover for shearwall?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
Stringer How many cm goes to landind
how to disign cuplock shuttering and it's matireal requirement snd any related web site
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
how many BSCs can i connect to the HUAWEI MSC
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
VAT and CST ? Which benefits for buyer ? Why benefits?