Answer / Gaurav Kumar Sanghal
To give clearance to a spare feeder, follow these steps: 1) Confirm that the existing load is properly transferred or isolated. 2) Disconnect the spare feeder from its source and verify that it's open-circuited. 3) Check for any residual voltage on the spare feeder using a voltmeter to ensure it's safe to work on. 4) Perform any necessary maintenance, testing, or installation work on the spare feeder. 5) Reconnect the spare feeder once the work is complete and ensure that the appropriate protective devices are in place.
| Is This Answer Correct ? | 0 Yes | 0 No |
what are the steps involved in generator load test?
Define rise time.
how MW increase when steam input increase in turbine.
What is GNR ? How much value of ground neutral resistance?
what is the value will come when megger the phase to phase ,phase to neutral ,phasae to ground ?
why voltage swells and dips in transmission line?
what is the function of rccb how it diffrentiate between elcb
Details about Flux Compensated magnetic Amplifer starter for motors
either water sensor or flow meter,how we observe the water level, f any other equipment are in market ?
What is C.T, why it is used and what care should be taken for that while connecting?
20 Answers Bhushan Power Steel,
In Plug used in house,Why Earth of the plug more thicker & deeper?
how to calculate the current carrying capacity of a 25 & 16 kva distribution transformer.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)