Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate the current carrying capacity of a 25 & 16
kva distribution transformer.

Answers were Sorted based on User's Feedback



how to calculate the current carrying capacity of a 25 & 16 kva distribution transformer...

Answer / nagarjun

Apply 1.732*v*i*cospi.. We hv to know Wt the supply voltage is..

Is This Answer Correct ?    3 Yes 0 No

how to calculate the current carrying capacity of a 25 & 16 kva distribution transformer...

Answer / k.prakashchandra

Take pf as unity. kva= v x I/1000 .If three phase 1.732 x Vline x I /1000

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

function of apfc pannel

3 Answers  


the electric traction poles having 3 cables n two cables touches with a insulator (or any) another one separated but it will be running 1-phase why?

4 Answers  


How can you sized or estimate the ligthning arrester current rating?

0 Answers  


Relative synchronous generator

1 Answers  


how can we change the supply voltage?

4 Answers   Areva,


tell me working of air circuit braker.

2 Answers  


Please give me a erda placement paper

0 Answers  


How much inductance or resistance require as a starter in series with induction motor of specific capacity(e.g. 5 hp) ? What is formula for it ?

0 Answers   Reliance,


What are the essential parts of a transformer?

2 Answers   NIT,


what is the purpose finding power factor?

3 Answers  


Either the Armoured Earthing strip of HT 3 core cable have to pass through CB CT or not , why ???

0 Answers  


IT IS SAID THAT THE OLTC OPERATION SHOULD NOT BE PERFORMED WHEN THE TRANSFORMER IS GENERATION TRANSFOREMR/STEP UP MODE. WHY IS IT SO?

1 Answers   MSETCL Maharashtra State Electricity Transmission Co Ltd,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)