Why we add salt in silt content test of sand? Full reason ?
Answer / yogendra
It may support the formation of flocks due to this the settlement of fine particles increase. Time of testing is reduced.
| Is This Answer Correct ? | 9 Yes | 1 No |
How do we test on design and style in a software?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
suppose we have a tendency to make a hole on the surface of the beam, than where we goes to make it?
what is construction joint? why do we give expancion joint in building?
What is meant by engineering drawing?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
0 Answers NCC, Sobha Developers,
what is the weight of concrete cube of 1ft*1ft*1ft? tell me weight in pound & in KG
to construct 1450 rft length of 6 feet wall how much cement sand and blocks are required????
4. What is your philosophy / attitude towards work?
How to calculate Volume of Wet cement concrete for a specific grade?
When you received a RA Bill of contractor at HO duly checked and certified by Site In-charge, How to know at a glance it is complete in order, do have any one checklist format in this regard.
i need gate exam civil engineering question papers with answers
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)