Answer / sk nishad

Calculated by gread of concrete

Is This Answer Correct ?    1 Yes 1 No

how to calculate the number of cement bags for basic construction..?..

Answer / er. vaseem ahamad

To know the requirement of cement bags for basic construction some information is required:
Drawing and design
Dimension of structure
Type of foundation
Grade of concrete
Proportion of mortar
Type of soil
Maximum 12-15% cost needed for cement of total cost of building.

Is This Answer Correct ?    0 Yes 0 No

how to calculate the number of cement bags for basic construction..?..

Answer / manjit

Around 40 bags of cement reqd. for 100 SFT of normal building construction area.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what will be the grade for M 30 ,35,40,45,50,55???

2 Answers  


What is the permissible limit of silt contain in sand for rcc Work?

7 Answers   Ambuja,


Soil bearing capacity formula

0 Answers  


how to do cementicious paint for rcc walls of cw pump house

0 Answers   APGenco,


which type of crust is best suitable to develop flexible pavement in rural roads i.e either with wet mix macadam or Water Bound Macadam and its reasons.

0 Answers  






how to estimate the earthwork,earth-filling for an isolated foundation

4 Answers  


How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m in the ratio 1:2:4 can any ine explain in detail by using formulas. Thanks in advance

2 Answers  


How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction

0 Answers  


How t find the quantity of materials required for construction of a wall of length 10x5x0.2

2 Answers   NCC,


what is the procedure for flakiness and elongation index

1 Answers  


The 4 main factors to start a construction project are––

0 Answers  


how many bags of cement,sand and Aggregate to p.c.c. of 1:2:4 ratio.

4 Answers   Isaac Designs,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)