how to calculate the number of cement bags for basic construction..?
Answer Posted / manjit
Around 40 bags of cement reqd. for 100 SFT of normal building construction area.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Why should appointment store person for project ? what is the benefits for company ?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
Explain creep?
how to do sudoko puzaals?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
What is absolute coordinates?
on what basis the partial factor of safety are decided? form the load combinations
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
How can i do RCC rate analysis?
List out some of the common problems that architect have to tackle it?
how to prepare site mix design