what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
No Answer is Posted For this Question
Be the First to Post Answer
How much is anchor length ?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
for mortar 1:18 how much cement and sand required for 1 CM
WHAT IS THE MELTING POINT OF STEEL?
wht is off shore structure
What is portland cement
how to calculate quantity of steel in a slab , coloumn and beam
1 Answers JSW, Om Sai Builders,
how to calculate the runner (2*3) qty in cft. the length is 8 feet.
6 Answers CCCL, Gammon, Greenko, L&T,
why the openings of sieves are square io size?
What is the tallest man made structure in the world?
Niti Aayog has recently chalked up an action to help India achieving _____ medals in 2024 summer Olympics after dismal performance in 2016 Rio Olympics? A)20 B)30 C) 40 D)50
What do you mean by the word 'shear'?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)