what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
No Answer is Posted For this Question
Be the First to Post Answer
density of flyash
how much quantity of tile placing can be finished by one mason per day?
how do you intend to overcome such challenges?
M30 me kitan pani lagat hai
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
what is superelevation?
Where is lap in top & bottom beam
how we check the thickness and line of ceiling plaster.
What is proportion of M25,M30,M35,M40 IN TH FORM 1,2,3,4?
What are the tests on concrete?
Whats the size cube
2 Answers Shimla Hills Construction,
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)