In few lines, please be elaborative on extras and talents that
make you a potential candidate for the post:
No Answer is Posted For this Question
Be the First to Post Answer
What is thumb rule in quantity and cost estimation of a residential building?
0 Answers Ascent Constructions,
in a building what is the thickness of a wall in metres? dafault wall value?
Water filter calculation formula
Where are u provide laps in columns & beams?
What is the meaning of soil reinforcement?
what is the weight of concrete for 1 cum?
reinforcement slab, beam and column formulas?
Brick work how many days curing and at any concreting pl
How Mney Layers in 8mm plywood
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
What is meant by 'zero value' in quantity surveying.
10 Answers DLS, Gammon, HCC, NCC,
Is there a way to know the aprox shuttering qty if vol of concrete is known? any thumb rule?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)