Answer / nadim shaikh
Bar bending schedule needs manual entry or MS Excel as follows in rows
1. sr. no
2. identification (name of member)
3. shape
4. cutting length (as per required by drawing and RCC consultant
5. total cutting length
6. numbers of members (if identical)
7. Dia of bar
8. per running meter weight of the bar multiplied by total running length
9. 8th point will give total weight of that particular member
10. remarks if any by client or consultant
Is This Answer Correct ? | 3 Yes | 0 No |
What is unit weight of normal concrete?
How much standard bricks required for a wall of 9*1200*1200 inches
how many bricks are required for masonary trench having length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr on single brick work as well as double ( 9" ) brick work
how many blocks will come per 1 meeter squear
What is the life of reinforcement?
wat is the necessity of finding shear and bending moment in a structure. wat will happen if it is not consider. other than shear cracks and deflection is there any other failure happen.
Which construction joint is much better ? either vertical or horizontal?
2 Answers MNT, Pratibha Industries,
Why we test compressive strength after 28 days..?
3 Answers NM Caramoan Builders,
why wire mesh is used in plastering
providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.
What is the cement consumption for waterproofing for residential building in sft?
what cement consumction plaster 15mm think per sqmt 1:3&1:6 how much kg.