Why should you show Client/Engineer activities clearly on the
project plan?
No Answer is Posted For this Question
Be the First to Post Answer
for basic costing, how can we calculate how much amount of steel and cocrete will go in per sqft? and what are the thumbrules?
whats is the Indian standard ratio for mix design M5 M10 M15 M20 M25 M30 M35 AND M40???
I need to constructive work in amaraj batteries
How much snowcem required per sq. Meter area
3 Answers Bhushan Power Steel,
how quantity of much blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork
What are the RISKS during the project construction?
it is possiblee to produce concrete with out cracks...
How to calculate the capacity of Water tank?
why canot DBM is continue as surface coarse insted of BC? what is dieefrence between DBM & BC?
what is the stripping time of beam?
What are the causes of failure of foundations and remedial measures?
1 cft have 13.5 No of Bricks, can someone help me to answer me for it's mathematically proof?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)