How do we calculate absolute pressure?
No Answer is Posted For this Question
Be the First to Post Answer
1sqm=? wood
2 Answers Ackruti, Nagarjuna Construction, SRS Group,
what is the least count of staff ?
how much quantity of cement and sand required for construction of 10 cum brick work( Brick size 3"*4"*9"(Standard size ) an d for 10 cum construction of SSM (Size stone masonary) with Cm 1:6 for both.
11 Answers GRC, KEC, L&T, Techno Electric and Engineering, UPENN,
Mention what are the composition of a landfill?
please help me to find a mix design ratio for M40....
Why sea sand and desert sand are dont used for construction
What is the name of this multiplication factors ?
0 Answers Engineers India Limited, L&T,
pls give me ans to ACT formula cube testing porpuse
What is geopolymer based concrete?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
why do we provide haunch for drains and culverts?
punj loyed and sapurjl palanjl