Answer Posted / n.r.gupta
1. system formwork
2. conventional formwork
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to calculate rate analysys of 1:6 plastering 10 sq m
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
Which are the Steel tests ?
how to tie 10 legged stirrups
What is the purpose of the gap in the road on this bridge?
What out turn civil works
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
How will be cutting in timber plate size 600*400 column size
for pretensioning which will yield first and same for post tensioning?
how can we calculate steel value, depending on load
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
what is w/c ratio in dry lean concrete for m10 mix design
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall