How to find out slope footing concrete
No Answer is Posted For this Question
Be the First to Post Answer
I have an span length 16 ft c/c
form work including the props can be removed from beams only after
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
What is an inverted beam??
Whether dry volume or wet volume of concrete more but why?
what do you understand by M25 concrete
What does civil status mean?
1m square 20mm plastering how much of water need curing work
2. What are the grades of steel used in the concrete design?
tell me quantitys of matal, sand and cement in 1:4:8 and 1:2:4
9 Answers AVL, Infosys, NCC, SPCL, Swapnapurti Developers,
how cubic feet cement,sand,aggregate required for 1 cubic feet ratio=1,1.5,3
how we can say that concrete is a plastic concrete
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)