adspace


I have an plot with area 35*47 = 182.77 sq yards.
Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

Answer Posted / Gori Shanker Rathaur

Cost estimation for a G+2 house with a total built-up area of 2700 sq ft (1350 sq ft per floor) may vary greatly depending on factors such as location, materials used, and contractor fees. Here's an approximate cost breakdown based on Indian construction industry standards:nLand cost: INR 1 crore - 6 croresnFoundation: INR 4 lakhs - 8 lakhsnStructure (Building material + Labor): INR 5 lakhs - 12 lakhs per floornElectrical wiring and plumbing: INR 3 lakhs - 6 lakhs per floornInterior finishing: INR 4 lakhs - 8 lakhs per floornTotal estimated cost: INR 2.5 crores - 10 crores

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1842


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1618


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1672


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

2428


plz.show development and anchorage length in simple diagram.

2640


VAT and CST ? Which benefits for buyer ? Why benefits?

1905


Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com

2102


Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

2087


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1923


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

2425


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2237


what is the 0 value in quantity surveying

2480


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

2365


pls mail some more tecnical qustions at msaranya2610@gmail.com

2184


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

2601