how to convert kg/m3 to kg/cft

Answers were Sorted based on User's Feedback



how to convert kg/m3 to kg/cft..

Answer / shadavali123@gmail.com

Kg/m3/35.76cuft=converter to kg in cube

Is This Answer Correct ?    9 Yes 2 No

how to convert kg/m3 to kg/cft..

Answer / madhavan

1m3/35.315cft

Is This Answer Correct ?    7 Yes 0 No

how to convert kg/m3 to kg/cft..

Answer / a.m.k

1m3 = (3.28*3.28*328)
= 35.28cft.
=

Is This Answer Correct ?    6 Yes 0 No

how to convert kg/m3 to kg/cft..

Answer / divusp

Divide by 35.31

Is This Answer Correct ?    3 Yes 3 No

how to convert kg/m3 to kg/cft..

Answer / ahsan

1 m=3.28 ft
1X1 mXm=3.28X3.28 ftXft
1X1X1 mXmXm=3.28X3.28X3.28 ftXftXft

1m3=35.28 ft3

Is This Answer Correct ?    0 Yes 0 No

how to convert kg/m3 to kg/cft..

Answer / n narendra

conversion from Cum to Cft = 1/(0.3*0.3*0.3) = 37.037 

so 1 Cum = 37.037 Cft

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

hook and bend length in reinforcement? 

1 Answers   ECCI,


what is the formula for calculating concrete in circular column ? pls explain with diagram add a link for diagram

1 Answers   jlpl,


HOW MUCH WATER DO YOU NEED TO MIX IN TO COMPACT100M3 OF ROAD QUALITY BORROWPIT GRAVEL

1 Answers  


What is the the difference between piller base and wall base ? give cost difference ?

1 Answers   DLF, L&T,


Difference between pre-tensioning and post-tensioning.

0 Answers  






if we have water only for hydration of cement,no water is available for curing of concrete.then how we can do curing of concrete

1 Answers  


what is the list of building construction equipment & teir output?

0 Answers  


How Many Cement Bags Are Used in 1 Sqm Area for Plaster????

8 Answers   Era Infra Engineering, FactSet Systems, Indu Projects, L&T, Reliance, Rites,


How much quantity water should be placed in one cubic meter area?

0 Answers  


How many bags of cement will be required for 45.5 M^3 Concrete with the ratio of 1 Cement+1 Crash+ 2 Sand+1 Gravel?

0 Answers   First MicroFinance Bank FMFB,


what we execute firstly wall tile or floor tile?

7 Answers   Colliers International,


What are some structures that may be subjected to fatigue?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)