Explain the water bound macadam roag
No Answer is Posted For this Question
Be the First to Post Answer
Ihave 230mm *115mm * 75mm brick calculation in cft and 115mm brick calculation in sft
Plaster area is 1000 sqft thickness is 12 mm so what will be the quantity of cement and sand
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
How to check the quality of cement?
what is the difference between factor of safety and partial safety factor.??
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
0 Answers Hashmi Constructions,
What is the stripping time of shuttering for PPC concrete
concrete mix design for M 30 Grade
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
What is meant by hydration of cement??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)