Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


if our load in 3 phase circuit is 4000 amp. calculate the capacity of capacitor panel if line power factor is.80 .



if our load in 3 phase circuit is 4000 amp. calculate the capacity of capacitor panel if line power..

Answer / aditya karkar

182.25kvar capacity of capacitor needed. 
       
solution= IL:4000A   V:440V   COS@1=.8
SO FIND REAL POWER P.
 THEN PUT IT IN   Qnet=P(tan@1-tan@2)
  we  have to make pf 1.so take @2=0

Is This Answer Correct ?    3 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

what is impedance?

1 Answers   PWD,


what is the maximum current carrying capacity of a 95 sqmm cupper under ground cable laid partialy in land and partialy in ground?

4 Answers  


what is transient voltage?

0 Answers  


During FEED, you will have all the information with regards to cable. How will you calculate the MTO for MV and LV Cables? what are your considerations?

0 Answers  


-What should be minimum value of insulation resistance and maximum value of earth resistance at any electrical instillation and what is method of testing the same.

0 Answers  


What is LSIG ?

6 Answers   Apollo Power,


-What is leakage current . how much leakage current is allowed.

3 Answers  


what is the benift of HT metering & LT metering

1 Answers  


what is the meaning of the symbol << >> put in transformer drawing

0 Answers   TATA,


A charge of 240 C is transferred in 2 minutes. The current flowing is:(a) 480A(b) 120A(c) 2A(d) 8A

2 Answers  


difference between local breaker backup relay or backup protection relay ?

1 Answers  


can anyone pls expain me about how can we design a cable tray??suppose if have to draw a 3 nos of 50 sqmm AYFY and 2 nos of 35 SQmm of AYFY cable through the tray..how can we design the tray size?? regards...

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)