How many bages of cement used in 1cft?and how we calculat sand and agregats
Answer Posted / sfz ans
http://theconstructor.org/practical-guide/estimated-quantities-of-materials-required-per-cubic-metre-of-compacted-mortar-or-concrete/1304/
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
What is labor and material payment bond?
what is directivity effect?
What is the difference between absorption & adsorption and sorption?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
What tor stands for in tor steel?
how to calculate the length diamond shaped striupps in column
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
Define block?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?