Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why we usually call 415 volts instead of 440 volts

Answers were Sorted based on User's Feedback



why we usually call 415 volts instead of 440 volts..

Answer / divya

instead of losses

Is This Answer Correct ?    4 Yes 3 No

why we usually call 415 volts instead of 440 volts..

Answer / keval

Becoz of the tolerance of 10% allowed....

Is This Answer Correct ?    0 Yes 3 No

why we usually call 415 volts instead of 440 volts..

Answer / rawat

For 230v single phase, 3phase will be 440v and for 240v the 3- phase will be 415v.

Is This Answer Correct ?    6 Yes 13 No

Post New Answer

More Electrical Engineering Interview Questions

1.Difference between vcb and Acb and partes. 2.Difference between STS and ATS.

2 Answers  


2 v/500amp/hr to 1.80vpc at 20 degree celsious 2v/5ooamp/hr to 1.75 vpc at 77degree farren .this is the capacity of a battery .what is the meaning of this . can i get a detailed explenation

0 Answers  


Why iron core losses are constant at all loads in a transformer ?

1 Answers   GATE,


how to calculate the cable size depending on the transformer rating

2 Answers  


What should be the values of settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot) to keep the system in transient state, to keep the system in steady state ?

0 Answers  


what is level 2 automation?

0 Answers  


how to carried out tan delta test in 11 KV alternator ?

0 Answers  


I want to know what is the short circuit level when 8 NOS 2000 kVA, 415v, 50hZ generator connected in paraller

1 Answers  


what is meant by generator differencial protection?

1 Answers  


What is third harmonic?what is the effect of it?

0 Answers   GMR,


Can we connect CBCT in the Busduct

1 Answers  


what is difference between 2 pole structure and 4 pole structure in transformer yard

0 Answers   Hospira,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)