what is the problem not getting 7 days slab cycle in Mivan
formwork? what is the output of mivan carpenter per day?

Answer Posted / abhijit machale

Carpentor per day output

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is tension footing?

1150


What are the composition of a landfill?

271


Is there any course for billing available in Mumbai? If yes then please mail me the details..

1436


how meny typs of renging rod?

1370


Name the main components of a cad gui?

302






where i can get material costs on weekly basis

1214


how to caluclate sienerge qty in construction in ap

1515


how to calculate mivan shuttering matrial

472


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

1772


what will happen if one could not properly follow the spacing of slab reinforcement bar?

1149


How do you determine specific gravity of cement?

266


How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm

589


RR masonry rate analysis

1837


How to calculate woden area in sft and Cft

698


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?