what is the problem not getting 7 days slab cycle in Mivan
formwork? what is the output of mivan carpenter per day?

Answer Posted / abhijit machale

Carpentor per day output

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is a kip?

706


How is the leaning tower of pisa supported?

630


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

1563


what is the criteria for the finalisation of pavement thickness in road project?

1580


material used for mendrel use to bend epoxy coated rebar

1687






on what basis the partial factor of safety are decided? form the load combinations

1795


What in your past experience or education prepares you for the position for which you are applying

1687


How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??

1578


WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT

2074


What is the cost difference between site mix and ready mix concrete per cubic meter

1430


Define What is unit weight of normal concrete?

661


What is the difference between Fe 500, Fe 500 D and Fe 515.

3651


Calculation of curtain wall of box culvert

5294


I need to constructive work in amaraj batteries

1384


What is the minimum size of the particles of silt soil?

781