what is the problem not getting 7 days slab cycle in Mivan
formwork? what is the output of mivan carpenter per day?

Answer Posted / er nitin lahane

Per day work for 1 carpenter is minimum 10 sqm per, I.e your shuttering area is 3250sqm you completed work in one day you are required 325 carpenter.you complete work in 8 day you required 40 carpenter per day. Ok

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is meant by csr in foundation? what is sbc?what is meant by contour line?

1276


Why steel rods are produced only in even dimensions?

1778


What are the advantages of cad software?

262


what is tension footing?

1150


How do you calculate the power of centrifugal pump?

267






I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1275


Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice

1730


What is meaning of tlc

1091


Explain moment of inertia?

251


within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

1151


how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step

1199


Aptitude, reasoning, quants, verbal and technical question

559


how to check and keep control on the wastage of material at site

1483


What are the different types of foundation?

286


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

2023