what is the problem not getting 7 days slab cycle in Mivan
formwork? what is the output of mivan carpenter per day?
Answer Posted / abhijit machale
Mivan shuttering output per day
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
In jack arch floor, the rise is kept?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
length where bent up is made in slab of bridge from one end
how much need sand and cement for 1 cft roof construction?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
silt%= silt volume/ silt+sand volume is this right?
strength vs shape factor
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
what is project?
what is a well
What is M40 _ TOR - EQ and B.F.S
What is .Dwg?
Material calculation of cm 1:6 for 1sqm
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?